Aug. 2006

August Photo Journal

 

August 25, 2006

The elevator doors are polished while the plywood remains to protect the floor.

 

August 24, 2006

       

On the third and fourth floors, new drywall and elevator doors are installed.  Prior to the renovation, a wire cage surrounded the elevator shaft, with wire mesh doors.  Now the doors cannot be opened unless the elevator is on at the floor. 

 

August 11, 2006

The new equipment to open the elevator doors has arrived, and will be installed in the next few days.